Enki Multimedia

Enkiway, by Enki Multimedia

Networking made simple.

A connectivity platform for developers and small teams: publish applications, reach private services, manage outbound traffic and connect sites, without running the network yourself. Enki Multimedia operates it on AS209823.

Four capabilities, one platform

Each capability has its own status. We publish a date only once it is set.

Opens on 2 December 2026Released on 2 December 2026

Tunnel

Publish selected applications through managed public endpoints, without opening inbound ports.

In design, no date announced

Access

Control who can reach private applications and services.

In design, no date announced

Egress

Manage outbound connectivity and source addresses. Need a fixed source address now? See fixed egress.

In design, no date announced

Network

Connect private networks and sites.

How Tunnel is designed to work

Two separate things happen: the connector opens one outbound connection, then requests from the Internet travel back to your application through that connection.

1. The connector opens an outbound connection

Enkiway connectorNext to your application, on your network
outbound, encrypted (QUIC)
Enkiway edgeRun by Enki on AS209823

2. A request reaches your application through it

Visitor or webhookAnywhere on the Internet
Public endpointOn the Enkiway edge
Existing connectionThe one opened in step 1
Your applicationUnchanged, on private infrastructure
Step 2 reuses the connection from step 1; nothing new is opened into your network. The public endpoint is reachable from the Internet: publishing a service through a tunnel does not make it private.

How it is built

The planned design, on open protocols and our own implementations of them.

  • Tunnels use MASQUE over HTTP/3; other transports can follow.
  • The connector to edge link runs over QUIC, which is encrypted with TLS 1.3.
  • Configuration and traffic travel on separate paths.
  • The edge is written in Erlang/OTP, on erlang_quic and erlang_masque.

Enkiway will have a free tier and paid plans. Plan names, quotas and prices are published at release.

Interested in Enkiway?

Tell us what you want to connect. Tunnel opens on 2 December 2026; we publish other dates once they are set.Tell us what you want to connect. Tunnel was released on 2 December 2026; we publish other dates once they are set.

sales@enki-multimedia.eu